Maryborough Bridge
The existing bridge and substandard northbound on-ramp at Maryborough Hill will be removed and replaced with a widened bridge built to modern design standards. The new structure will provide greater capacity and safer, wider footpaths for pedestrians and cyclists. This upgrade will eliminate a known safety risk and support a safer, higher-capacity, and strategically aligned M28 road network.